Specifications
-
Each module is made from
2-inch tubular steel, which supports a grate system capable of
holding 2 tons of material.
-
The
grate is constructed of heavy welded wire and galvanized.
-
Power requirements: 110-volt
single phase with a GFI circuit.
-
The
clean out mechanism uses 2 each 110V. Electric winches.
-
Worm
population: 100lb per 8 ft increment. Startup should be no less than
50 lb. per 8 ft increment.
-
All components are powder
coated for a long lasting finish.
-
Optional lids and
ventilation systems are available.
Benefits
and Features:
-
Flow through design- Organic
waste in on the top and finished Vermicompost out the bottom provide
95% worm free. 90% of the worm population will be found in the top 4
inches of the worm bed. Harvesting begins 6-8 weeks after
setup.
-
Year around use, 365 days a year.
-
Highly aerobic conditions
are easily maintained
-
No loss of nutrients due to
seepage into the ground.
-
No need to turn materials
-
After initial inoculation no
further worm population will be needed. The population will
propagate and maintain ample populations to process the organic
feedstock.
Daily maintenance required (1 hour per day max.)
To determine the
correct size of machine an accurate survey of daily waste to be
processed will be required.
The machine will
need to be indoors in a heated environment for winter use. Minimum
temperature should be no less than 50°
F. No direct sun. Optimal
temperatures 70-80°
F.
Concrete or
asphalt floor is required.
|
Size
|
Square
Footage
|
Processing
Capacity *
|
Pricing
|
|
5'x8'
|
40
|
100lb/day
|
5465.00
|
|
5'x16'
|
80
|
200lb/day
|
8329.00
|
|
5'x24'
|
120
|
300lb/day
|
11195.00
|
|
5'x32'
|
160
|
400lb/day
|
14062.00
|
|
5'x40'
|
200
|
500lb/day
|
16929.00
|
|
5'x48'
|
240
|
600lb/day
|
19796.00
|
*The
processing capacity is dependent on the aerobic condition of the organic
waste being processed and type of material.
Shipping:
FOB Oregon
Delivery
is 30-45 days from the order date.
Orders accepted via email. Shipping quote offered
on request.